SL
NO. |
Category |
Description
of
the
Work |
Name
and
Address
of
the
Employer |
|
1 |
Railway |
Construction
Damodar
in
Bowichandi
-
Khana
section
of
BDR
Gauge
Conversion
Project
of
SE
Railway
in
the
jurisdiction
of
Dy.CE/Con./Barddhaman |
Chief
Engineer/Con/I
S.E.Railway,
Garden
Reach,
Kolkata
- 43 |
|
2 |
Railway |
Earthwork
in
formation,
blanketing
works,
construction
of
minor
RCC
Bridges,
retaining
walls,
river
protection
works
at
both
approaches,
construction
of
14
inits
Type
- I,
24
units
Type
- II
Qtrs.,
Road
boundary
walls
and
water
storage
Over
Head
Tank
at
Azimganj
Jn. |
Chief
Administrative
Officer
(Con),
Eastern
Railway,
14,
Strand
Road,
(4th
Floor),
Kolkata
-
700
001 |
|
3 |
Railway |
Assembly,
erection/
launching
steel
girders
for
rail
cum
road
bridge
across
River
Ganga |
IRCON
International
Ltd,
District
centre,
Saket,
ND
110017 |
|
4 |
Railway |
Construction
of
Steel
Super
structure
(1*135M+1*150M+1*135M)
of
the
new
Rail
bridge,
as a
replacement
of
the
existing
Jubilee
Bridge
across
River
Hooghly
in
between
Naihati-
Bandel
section
of
Eastern
Railway |
Chief
Administrative
Officer
(Con),
Eastern
Railway,
14,
Starnd
Road,
(4th
Floor),
Kolkata
700
001 |
|
5 |
Railway |
Construction
of
1.80
Kms
long
tunnel
on
realigned
path
and
carrying
out
reprofiling
work
in
balance
length
of
existing
Tunnel
No.
1
including
blanketing,
earthwork,
&
construction
of
side
drain
etc.,
in
zone
E-2
between
Tunnel
No.
1
Katra
end
to
Road
Over
Bridge
Sambal
on
Udhampur-Katra
in
connection
with
Udhampur-Srinagar-Baramulla
Rail
Link |
The
General
Manager
Northern
Railway
Kashmere
Gate
Delhi |
|
6 |
Railway |
Construction
of
foundation
and
substrcuture
of
bridge
over
river
Matla,
(Span
4x18.3
M +
17x45.7
M)
with
RCC
bored
cast
in
situ
piles
of
1200
mm
diameter
and
other
anciallry
works
in
connection
with
Extention
of
New
B G
line
beyond
Canning
to
Bhangankhali |
Chief
Engineer/Con/I
Eastern
Railway
14,
Strand
Road,
4th
Floor
Kolkata
-
700
064 |
|
7 |
Railway |
Construction
of
Major
Bridge
over
National
High
way
near
Bagnan
(RUB)
(1x61.00m)
Steel
Through
Girder
and
Major
Bridge
over
Damodar
River
(8x45.7m)
including
Substructure,
Transportation,
Erection
and
Launching
of
Super
structure,
Earth
work,
Minor
Bridges,
from
Ch-1500
m to
Ch.
-
3100
m
and
other
miscellaneous
works
in
connection
with
Bagnan
-
Amta
new
line
project
under
the
jurisdiction
of
Dy.
CE/Con/KGP,
S.E.
Railway |
Chief
Engineer
(Con)/HQ/GRC
South
Eastern
Railway
Garden
Reach,
Kolkata
-43 |
|
8 |
Railway |
Construction
of
bridge
across
river
Paglachandi
(6X18.3m)
in
between
stations
Debogram
and
Paglachandi,
construction
of
bridge
No.
36/A
of
span
configuration
(3X24.4m)
in
between
stations
Sonadanga
and
Debogram
resting
on
1.2m
diameter
pile
foundations
and
having
composite
girders
alongwith
other
ancillary
works
in
connection
with
doubling
between
Bethuadahari
and
pallassey. |
Chief
Administrative
Officer
(Con)
Eastern
Railway,
14,
Strand
Road,
(4th
Floor),
Kolkata
-
700
001 |
|
9 |
Railway |
Execution
of
Earth
work
in
bank
and
cutting
including
sand
layer
at
bottom
and
blanketing
at
top,
construction
of
Minor
Bridges,
construction
of
sub-ways,
ballast
supply,
transportation
of
P-way
materials,
P-way
linking
and
maintenance
(P.
way
works
to
be
done
from
Deshpran),
supply
of
steel
and
cement,
construction
of
staff
quarter,
service
building
etc.
in
section
- II
from
Chinage
2100.00
to
10700.00
in
connection
with
Deshpran-Nandigram
new
rail
link
project
of
South
Eastern
Railway. |
Chief
Engineer
(Con)/HQ/GRC
South
Eastern
Railway
Garden
Reach,
Kolkata
-43 |
|
10 |
Railway |
Construction
of
steel
structural
shed
with
foundation,
building,
path
-
way,
drains,
heavy
duty
flooring,
pits,
washing
apron
and
other
ancillary
works
inside
Liluah
worshop
in
connection
with
Modemisation
of
work
shop
(Phase
- I) |
Chief
Administrative
Officer
(Con)
Eastern
Railway,
14,
Strand
Road,
(4th
Floor),
Kolkata
-
700
001 |
|
11 |
Railway |
Execution
of
Earth
Work
in
formation
including
blanketing,
Construction
of
minor
bridges
(RCC
Boxes
and
Hume
pipes
etc.),
Level
crossing,
Drains
and
other
connected
works
in
between
Ch:-
3300
m to
Ch:-
7500m
(excluding
approaches
of
major
Bridges
i.e.
from
3445m
to
4148m
and
Ch.
6813m
to
7261m
in
connection
with
Khana-Bowaichandi
new
line
in
the
jurisdiction
of
Dy.
Chief
Engineer
(Con),
BWN,
S.E.
Railway
(Sec-I) |
Chief
Engineer
(Con)/HQ
South
Eastern
Railway
Garden
Reach,
Kolkata
-
700
043 |
|
12 |
Road |
Development
of
State
Highways
in
the
State
of
Bihar
under
(RSVY)
Package
No.
19B,
District
(s)
Lakhisarai
&
Jamui |
Executive
Engineer
(CS)
III,
Central
Public
Works
Deptt.,
E-Wing,
Nirman
Bhawan,
New
Delhi
-
110012 |
|
13 |
Road |
Development
of
State
Highways
in
the
State
of
Bihar
under
Rashtriya
Sam
Vikas
Yojna
(RSVY);
(SH:
Approach
Road
to
the
Bridges
on
SH-4
(Gaya-Hulasganj),
SH-07
(Gaya-Daudnagar)
&
SH-08
(Hisua-Sikandra) |
Executive
Engineer
RSVY
Project
Division,
Gaya
383,
2nd
Floor,
A.P.
Colony,
Gaya |
|
14 |
Road |
2-laning
with
paved
shoulder
of
the
Piprakothi
to
Raxaul
Section
of
NH-28A
from
Km.
0.600
to
Km.
62.064
in
the
State
of
Bihar
under
NHDP
Phase-III
on
BOT
(Toll)
Basis.
(BOT
BASIS) |
Chief
General
Manager
(Technical),
National
Highways
Authority
of
India
G-5&6,
Sector-10,
Dwarka,
New
Delhi-110075 |
|
15 |
Road |
Periodical
Renewal
from
Km
183/00
to
208.00
on
NH-54
in
the
state
of
Mizoram
(Job
No.
TA-054-MZ-2010-11-069) |
Chief
Engineer,
PWD,
Highway,
Aizawl
Mizorama |
|
16 |
Road |
Rehabilitation
and
Resurfacing
of
road
from
West
Phaileng
to
Marpara
Road
(0.00-27.00
Kmp),
Package
I |
The
Superintending
Engineer,
P.W.D.,
Western
Circle,
Aizawl |
|
17 |
Urban |
Design,
Construction,
Commissioning,
opeartion
and
maintainance
of
14
MLD
Sewage
Treatment
Plant
on
turn
-
Key
basis
at
Action
Area
IIB
in
New
Town
Kolkata
Project |
Office
of
Superintending
Engineer,
New
Town
Kolkata
Water
Supply
Circle,
PHE
Directorate,
CF -
162,
Sector
- I,
Saltlake
City,
Bidhan
Nagar,
Kolkata
-
700
064 |
|
18 |
Urban |
Erection
and
commissioning
of
ground
water
based
Piped
W/S
Schemes
in
Arsenic
Affected
Areas
of
Different
Blocks
in
the
District
of
Murshidabad.
(Group
X)
Part
- B |
Govt.
of
W.B.
,
Mushidabad
Circle
:
PHE
Dte.,
Berhampore,
Murshidabad
(Murshidabad
Division) |
|
19 |
Urban |
Erection
and
commissioning
of
ground
water
based
Piped
W/S
Schemes
in
Arsenic
Affected
Areas
of
Different
Blocks
in
the
District
of
Murshidabad.
(Group
X)
Part
- A |
Govt.
of
W.B.
,
Mushidabad
Circle
:
PHE
Dte.,
Berhampore,
Murshidabad. |
|
20 |
Urban |
Ground
water
based
piped
W/S
Schemes
in
the
Arsenic
Affected
different
Block
under
North
24
Pgs
Dist.
West
Bengal.
(Group-2) |
Govt.
of
W.B.
,
Eastern
Circle
:
PHE
Dte.
(Barasat) |
|
21 |
Urban |
Construction
of
Sewerage
&
Drainage
for
Borough
VII
including
House
Connection
Lot
- 2
(Contract
Package
No.
KEIP/ICB/SDF2/2006-07)[Topsia] |
Kolkata
Environmental
Improvement
Project
(KEIP)
206
AJC
Bose
Road,
Kolkata
- 17 |
|
22 |
Urban |
Construction
of
Sewerage
&
Drainage
for
Borough
VII
including
House
Connection
Lot
- 1
(Contract
Package
No.
KEIP/ICB/SDF1/2006-07)[Topsia] |
Kolkata
Environmental
Improvement
Project
(KEIP)
206
AJC
Bose
Road,
Kolkata
- 17 |
|
23 |
Urban |
Construction
of
Sewerage
&
Drainage
for
Borough
XV
including
House
Connection
(Contract
Package
No.
KEIP/ICB/SDE/2006-07)[Garden
Reach] |
Kolkata
Environmental
Improvement
Project
(KEIP)
206
AJC
Bose
Road,
Kolkata
- 17 |
|
24 |
Urban |
Construction
of
ramp
Of
Beck
Bagan
Crossing
at
A.J.C
Bose
Road |
HRBC,
St
Georges
Gate
Road,
Kolkata-
700021 |
|
25 |
Urban |
Upgradationa
and
Strenghtening
of
Aizawl
Civil
Hospital,
Mizoram |
Mission
Director,
NRHM,
Mizoram
Health
Society,
Aizawl
|
|
26 |
Urban |
Upgradationa
and
Strenghtening
of
Champai
Civil
Hospital,
Mizoram |
Mission
Director,
NRHM,
Mizoram
Health
Society,
Aizawl
|
|
27 |
Urban |
Survey
Enineering
design
and
construction
of 2
stages
Raw
Pumping
system,
augmentation
of
the
capacity
of
the
existing
water
treatment
plant,
laying
of
clear
water
gravity
main
and
feeder
main
pipelines,
construction
of
clear
water
pumping
system
package
associated
with
augmentaion
of
water
supply
to
Shllong
Urban
centers
of
Great
Shilong
Water
supply
scheme
Phase
III
under
JNNURM |
Govt.
of
Meghalaya,
Public
Health
and
Engineering,
Meghalaya,
Shillong |
|
28 |
Urban |
CU
unit
for
Brahamaputra
petrochemical
Complex
of
M/s
Brahamaputra
Cracker
and
Polymer
Ltd.
at
Lepetkata,
Assam
(Part
B) |
DGM
(C&P)
Brahamaputra
Cracker
and
Polymer
Ltd
Hotel
Brahmaputra
Ashok,
MG
Road,
Guwahati
-
781001,
Assam |
|
29 |
Urban |
Civil
works
in
connection
with
integration
of
Airport
line
with
Metro
Rilway
between
Noapara
and
Dum
Dum
Cantonment |
Chief
Engineer,
Metro
Railway,
Kolkata |
|
30 |
Urban |
Development
of
Parking
Complex
at
Sanjauli,
Shimla
in
Public
Private
Partnership
(PPP)
format.
(BOT
BASIS
CONTRACT) |
General
Manager
H.P.
Infrastructure
Development
Board,
New
Himrus
Building,
Circular
Road,
Shimla
-
171001 |
|
31 |
Urban |
Construction
of
588.0m
long
PC
Girder
Bridge
over
Modhumati
river
on
Gopalgonj-Singati
Upazila
(Chapail
Ferrighat)
Road
at
Ch.
2400m
under
Sadar
Upazila
of
Gopalgonj
District. |
The
Executive
Engineer,
LGED,
Gopalgonj |
|
32 |
Urban |
Construction
of
High
level
Bridge
(20
span
37.758)
metre
each
(755.160
metre)
crossing
river
at
Dhanoya
Pattan
including
Toll
Plaza
in
Km
5.65
in
District
Gurdaspur |
Chief
Engineer
(IP)
Pb.
PWD
B&R
Branch,
Chandigarh |
|
33 |
Urban |
Construction
of
High
Level
Bridge
over
Satluj
River
including
Appraoches,
Guide
Bunds
and
Toll
Plaza
crossing
Ludhiana
Rahon
road
near
village
Mattewara
in
District
Ludhiana |
Chief
Engineer
(IP)
Pb.
PWD
B&R
Branch,
Chandigarh |
|
34 |
Urban |
Construction
of
686.75m
PC
Girder
Bridge
on
Arialkha
River
Kalkini
Upazila
Sadar-Kasherhat
GC
road
at
ch
12000m
under
Kalkini
Upazila |
Executive
Engineer
LGED,
Madaripur,
Bangladesh |
|
35 |
Urban |
Civil,
Structural
&
Architectural
works
for
certain
BOP
and
Misc
Buildings
civil
works
at
2X750MW
Pragati
III
Combined
cycle
power
project
at
Bawaa,
Delhi. |
SDGM/SCT
Bharat
Heavy
Electricals
Limited
Power
Sector
-
Northern
Region,
Distt.
Gautam
Budh
Nagar
Noida
-
201301 |
|
36 |
Urban |
Water
Supply
and
Sewerage,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project
-
Indrapur,
Morang |
Project
Director
Project
Management
Office,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project,
Panipokhari,
Kathmandu,
Nepal |
|
37 |
Urban |
Water
Supply
and
Sewerage,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project
-
Sandhikharka,
Arghakanchi |
Project
Director
Project
Management
Office,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project,
Panipokhari,
Kathmandu,
Nepal |
|
38 |
Urban |
Water
Supply
and
Sewerage,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project
-
Damak,
Jhapa |
Project
Director
Project
Management
Office,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project,
Panipokhari,
Kathmandu,
Nepal |
|
39 |
Urban |
Water
Supply
and
Sewerage,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project
-
Baglung,
Baglung |
Project
Director
Project
Management
Office,
Second
Small
Towns
Water
Supply
and
Sanitation
Sector
Project,
Panipokhari,
Kathmandu,
Nepal |
|
40 |
Urban |
Remodeling
and
Covering
of
Subhash
Nagar
Drain
Starting
from
Najafgarh
Road
to
Najafgarh
Drain. |
Executive
Engineer
Project-II,
West
Zone,
MCD,
Moti
Nagar,
New
Delhi
-15 |
|
41 |
Marine |
Construction
of
inland
Water
Transport
Terminal
High
Leval
Permanent
RCC
jetty
over
River
Hooghly
(NW-1)
khidirpore,
Kolkata |
Executive
Engineer,
Kolkata
Central
Division
No.
VII,
C.P.W.D,
Nizam
Place,
Kolkata
- 20 |
|
42 |
Marine |
Construction
of
high
level
jetty
at
Pandu,
Guwahati |
CPWD,
Executive
Engg
Project
Division
No.
II,
D.S.
mansion,
R.G.
barua
Road,
Guwahati |
|
43 |
Power
Transmission |
Construction
of
33kv
transmission
line
from
Lawngtlai
to
Saiha
|
Superintending
Engineer
Lunglei
Power
Circle,
Lunglei
|