SL NO.

Description of the Work

Name and Address
of the Employer
1

Providing and installing of Pre-stress anchors for well foundations in major bridge no. 26 in connection with construction of new B. G. Line between Koderma-Hazaribag section under
Dy. CE/Con/I/HZME

Executive Engineer / Con
East Central Railway
Hazaribaj
2

Execution of Civil Engineering Works of PSC via duct between Noapara and Dum Dum Cantonment and various Civil works at Noapara in connection with integration of Airport Line with Metro Railway.

Chief Engineer
Metro Railway, Metro Rail Bhavan,
8th Floor, 33/1, J.L. Nehru Road,
Kolkata - 71
3

Development of State Highways in the State of Bihar under Rashtriya Sam Vikas Yojna (RSVY); (SH: Approach Road to the Bridges on SH-4 (Gaya-Hulasganj), SH-07 (Gaya-Daudnagar) & SH-08 (Hisua-Sikandra)

Executive Engineer
RSVY Project Division, Gaya
383, 2nd Floor, A.P. Colony, Gaya
4

Construction of Muallungthu - Khumtung Road (Sh:- Pavement work 0.00 - 11.60 Kmp)

The Superintending Engineer
PWD,
Western Circle, Aizawl
5

Development of Parking Complex at Sanjauli, Shimla in Public Private Partnership (PPP) format. (BOT BASIS CONTRACT)

General Manager
H.P. Infrastructure Development Board,
New Himrus Building, Circular Road,
Shimla - 171001
6

Fabrication & Assembly BTPN Wagon along with supply of couplers 250 Nos.

Sr. Manager (Purchase)
Braithwaite & Co. Limited
5, Hide Road
Kolkata 700 043
7

Fabrication and Assembly of BCNAHSM1 wagon. (337Nos)

Sr. Manager (Purchase)
Braithwaite & Co. Limited
5, Hide Road
Kolkata 700 043
8

Execution of Earth work in bank and cutting including sand layer at bottom and blanketing at top, construction of Minor Bridges, construction of sub-ways, ballast supply, transportation of P-way materials, P-way linking and maintenance (P. way works to be done from Deshpran), supply of steel and cement, construction of staff quarter, service building etc. in section - II from Chinage 2100.00 to 10700.00 in connection with Deshpran-Nandigram new rail link project of South Eastern Railway.

Chief Engineer (Con)/HQ/GRC
South Eastern Railway
Garden Reach, Kolkata -43
9

2-laning with paved shoulder of the Piprakothi to Raxaul Section of NH-28A from Km. 0.600 to Km. 62.064 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.

Chief General Manager (Technical),
National Highways Authority of India
G-5&6, Sector-10, Dwarka,
New Delhi-110075
10

Construction of steel structural shed with foundation, building, path - way, drains, heavy duty flooring, pits, washing apron and other ancillary works inside Liluah worshop in connection with Modemisation of work shop (Phase - I)

Chief Engineer/Con/III
Eastern Railway
14, Strand Road, 4th Floor
Kolkata - 700 064
11

Construction of 1.80 Kms long tunnel on realigned path and carrying out reprofiiing work in balance length of existing Tunnel,No. 1 including blanketing, earthwork & construction of side drain etc. in zone E-2-between Tunnel no.1 Katra end to Road Over Bndge Sambal on Udhampur - Katra section in connection with Udhampur-Srinagar- Baramulla Rail Link.

General Manager, Northern Railway Headquarters Office, Kashmere Gate, Delhi